Book a Demo Building it yourself means a gateway, an ITAR compliance program, and people to run both: $112,500* in year one before your first token. Consus Teams for a 49-person shop is $23,520 a year, and you're in production in days. The tokens cost the same either way.
Tokens appear on neither side because both paths pay the same raw GovCloud rates. This is what access costs.
| Build it yourself | Consus Gateway | |
|---|---|---|
| Consus Teams subscription | $0 | $23.5K |
| Gateway engineering | $37.5K | $0 |
| ITAR compliance setup | $75.0K | $0 |
| Total cost, year 1 | $112.5K | $23.5K |
| Your AI tokens | GovCloud rates | Same |
| Time to production | 3 months | Days |
| Compliance risk | Your team owns it | Consus owns it |
DIY ops run every year. The Consus subscription stays flat.
| Year | DIY cost | Consus Teams | Annual savings | What the DIY money buys |
|---|---|---|---|---|
| Year 1 | $112.5K | $23.5K | $89.0K | Gateway build + ITAR compliance setup |
| Year 2 | $112.5K | $23.5K | $89.0K | Compliance ops + engineering ops |
| Year 3 | $112.5K | $23.5K | $89.0K | Compliance ops + engineering ops |
| Year 4 | $112.5K | $23.5K | $89.0K | Compliance ops + engineering ops |
| Year 5 | $112.5K | $23.5K | $89.0K | Compliance ops + engineering ops |
| 5-year total | $562.5K | $117.6K | $444.9K |
Handling CUI? Building it yourself costs more: your AI setup goes into your CMMC assessment, which adds about $50,000 up front and a re-audit every three years. Enterprise pricing includes the Body of Evidence for that assessment.
Talk to us →Every assumption is set at the low end of reality. Real programs routinely run higher.
| Year-1 engineering (bring-up) | $37.5K | Build the gateway and connect the clouds; 1 engineer × 3 months at $150K |
| Year-1 ITAR compliance setup | $75K | 0.5 FTE × $150K to document controls, restrict access to US persons, and write the technology control plan |
| Ongoing compliance ops | $75K/yr | 0.5 FTE × $150K, real cost is 0.75–1.0 FTE |
| Ongoing engineering ops | $37.5K/yr | 0.25 FTE × $150K to run, patch, and update the gateway |
| Time to production | 3 months | Aggressive; first builds routinely take longer |